(peculiar) Spec Electronics/aircraft/(e2c) Parts

End item NSN parts
Filter By: Branched Wiring Harnes
page 1 of 1
Part Number
NSN
NIIN
121230-1 Branched Wiring Harness
000038834
121230-2 Branched Wiring Harness
000038834
123AV72220-1 Branched Wiring Harness
014089918
123SCAV5172-1 Branched Wiring Harness
000038834
405311-902 Branched Wiring Harness
014084648
547939-100 Branched Wiring Harness
000085371
Page:

(peculiar) Spec Electronics/aircraft/(e2c)

Picture of (peculiar) Spec Electronics/aircraft/(e2c)

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections. The Project Management Body of Knowledge (PMBOK 5) defines the work breakdown structure as a "A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables."

A work breakdown structure element may be a product, data, service, or any combination thereof. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

WBS is a hierarchical and incremental decomposition of the project into phases, deliverables and work packages. It is a tree structure, which shows a subdivision of effort required to achieve an objective; for example a program, project, and contract. In a project or contract, the WBS is developed by starting with the end objective and successively subdividing it into manageable components in terms of size, duration, and responsibility (e.g., systems, subsystems, components, tasks, subtasks, and work packages) which include all steps necessary to achieve the objective.

今すぐ比較»
クリア | 隠れる